Well Control
We are not only the oldest, most experienced well control company in Canada, our historical record proves we are the best.
Customized equipment and highly trained personnel have allowed us over 800 successful emergency responses worldwide. Below you will find a brief showcase of our well control and blowout services. Please visit our galleries for a trip through our 60 years of operational excellence and success.
Land/Off Shore Based Well Control
- ERP Development
- Loss Control and Prevention Consultation
- Drilling Emergency Response
- Completions Emergency Response
- Production Emergency Response
- Post Emergency Investigation and Review
Aqua Freeze Service
- Mud Injection and N2 Based System
- Mud Injection and Dry Ice Application
- Large Diameter Casing and Pipe Options
- Active Wellhead Control
- Active Pipeline Control
Equipment

Combination Fire/Shower Unit
- Trademark “Smokey Series”
- 3000 GPM Hale Pump
- Direct Foam Injection System
- 1100 Gallons of Water
- 325 Gallons of AR-AFFF Foam
- 500 lb. Dry Chemical Vessel
- 3 Man Decontamination Module
- Patient Recovery Area
- Meets ANSI Specifications

Blowout Response Support Unit
- Additional Fire Apparatus Inventory
- Specialized Tool and Equipment Inventory
- On board Auxiliary Power Supply
- Auxiliary Arial Lighting

High Volume Monitor Shack
- For shielding our fire fighter(s) from extreme temperatures
- For applying high flow rates of water through a monitor

Dry Chemical Skid
- 3000 lbs of Purple “K” Powder
- Quick “knock-down” properties for extinguishing energized liquid and gas fires

Customized Protection Service
- Heat shield to protect equipment hydraulic systems
- Heat shield to protect equipment operators
- Excavators and dozers are utilized to clear debris

Specialized Equipment Systems
- 5000 GPM split case fire suppression system skid
- Fully stocked tool and supply container
- Fully stocked high pressure breathing air container

Freeze Pumping System
- Mud Injection and N2 Based System
- Mud Injection and Dry Ice Application
- Large Diameter Casing and Pipe Options
- Active Wellhead Control
- Active Pipeline Control
Meet Our Experts

Mike Miller
Well Control Consultant
- 50 plus years’ experience
- Provides on-site and executive consultation services
- Worked and supervised over 600 domestic and international well emergencies

Curtis Wright
Well Control Specialist
- 20 plus years’ experience
- Edmonton Station Manager
- Worked and supervised over 10 well emergencies

Nelson Hertz
Well Control Crew Chief
- 10 plus years’ experience
- Fire Services Manager
- Well Freeze Supervisor
- Worked and supervised over 40 well emergencies